Search by Certificate Number

The Viking Corporation

210 N Industrial Park
Hastings
Michigan 49058
USA

Tel: +1 269 945 9501 • Fax: +1 269 945 9599
Email: techsvcs@vikingcorp.com • Web: www.vikingcorp.com

Additional Addresses

UK Sales Enquiries:

Tel: +44 (0)1427 875999 • Fax: +44 (0)1427 875988


Certificate No 096d




Product Description LPCB
Ref. No.
Viking Firecycle III Cycling (single interlocked) System

Flow control valves (Model H-1) 50mm 80mm 100mm 150mm

Control panel (Model B-1)

Heat detectors (Type FC 1002 - 140o F)

M1 cable used for connecting the heat detectors in a series circuit

096d/02
Viking Firecycle III Cycling (double interlocked) System

Flow control valves (Model H-1) 50mm 80mm 100mm 150mm

Control panel (Model E-1)

Heat detectors (Type FC 1002 - 140o F)

096d/03

 

Approval Conditions:
  1)    The above Firecycle systems employs duplicate solenoid valves.  For details of the solenoid valves contact Viking. The solenoid valves shall be LPCB approved.  
2)    Solenoid valves shall be installed in parallel.
3)    Solenoid valves may function in hydraulic or pneumatic conditions, and be protected by a strainer.
4)    Heat detectors compatible with the control and indicating equipment shall be used.
5)    Suitable electrical detection control and indicating equipment which is compatible with the equipment identified above shall be used. The control and indicating equipment should be LPCB approved/certificated.
6)    Connecting cables shall comply with BS 5839-1: 2002 and be LPCB approved.  
7)    The system shall be electrically monitored to demonstrate that it is in a ‘ready-to-operate’ state at all times.
8)    Clean dry air shall be used where applicable.
9)    The equipment must be installed, operated and maintained as prescribed in Viking Corporation’s installation, operating and maintenance manual.
10)    The Firecycle III systems shall be configured in accordance with Viking Corporation’s specifications.
11)    The Firecycle III systems shall comply with the details specified in LPC Technical Bulletin 208 Supplementary Requirements for sprinkler installations which can operate in dry mode.
12)    Viking Corporation are the firm responsible for the complete Firecycle III station, including electrics.

 


 

To read the Red Book section introduction click here.

 

< back to results page

< back to search page